Our projects

References from both divisions — from petrochemicals to prefabricated housing.

Petrochemicals

2024

Turnaround Rotterdam

Provided 40+ certified welders and pipefitters for a major turnaround.

Housing construction

2024

Prefab residential area Almere

Modular construction of 120 residential units — schedule met with a 15% margin.

 

Timber

2023

CLT hall construction Zwolle

Complete assembly of CLT load-bearing structure for logistics center.

Industry

2023

Maintenance of IJmuiden steel plant

Long-term maintenance contract with a dedicated team.

Utility

2023

Modular offices Eindhoven

Assembly and finishing of 8 modular units in 6 weeks.

Piping

2022

Utility pipelines Antwerp

Prefabrication and installation of 3 km of utility pipelines on site.